Global Maritime

MWS for Huizhou 25-8 Topside Float-Over Installation

 

Client: CNOOC Shenzhen  
Timeline: 2014 - 2015

Huizhou 25-8 topside float-over installation in South China Sea by CNOOC started in May 2014. GM China was the MWS. It was a full DP operated float-over installation. The topside weighs 18,000 tons. It was the first DP float-over installation in China.

Reference Work

Global Maritime, copyright 2016