Global Maritime

Installation of 3 flexible Risers for Mardura BD Field Development Project

 

Client: Boskalis
Timeline: 2017

Global Maritime Singapore (GMS) performed the engineering simulation study for the installation of Multi Phase Riser, Gas Export Riser and Umbilical.

 

GMS engineers worked closely with Boskalis to perform the motion analysis for the Riser Installation Vessel using HydroD and to carry out static and dynamic analysis using OrcaFLEX.

Reference Work