Global Maritime

Mooring Analysis and Operability Study for Tiger 1

 

Client: Opus Offshore
Timeline: 2015 - 2016

GMS performed the hydrodynamic study for Tiger 1 and mooring analysis for Tiger 1 for working at Falkand Island field, the analysis helped Opus to select the suitable mooring layout plan and mooring equipment.

 

GMS carried out the operability study for Tiger 1, determined the motion of Tiger 1 and produced the operability study chart.

Reference Work

Global Maritime, copyright 2016