MWS for Weizhou 12-2/11-4N Oilfield Project Phase 2

 

Client: CNOOC Zhanjiang
Timeline: 2014 - 2016

This project consists of two sub-projects: 


- Weizhou (WZ) 12-2 Oilfield Group Joint Construction Project
-  WZ11-4N Construction Project Phase There are five wellhead platforms, ten (pipelines (62.7km in total), and four cables (31.1km in total) installed, and seven existing platforms and some facilities of the WZ terminal will be refurbished. 

 

As the nominated MWS, GM China reviewed the procedure and calculation documents, and witnessed all the loadout, transportation and installation operation of platforms, pipeline and cables.