Global Maritime

Preline - Closed Containment System

 

Client: Preline Fishfarming Systems (Lerøy)
Timeline: 2015 - ongoing

Global Maritime has been responsible for the hydrodynamic design and all hydrodynamic analyses on Preline’s closed fish-farm (also known as the Lerøy Pipe-farm).

 

We have been involved from the start of the project, and our activities can best be summarized as follows:

 

-  Hydrodynamic Design

-  Transport & Installation Analyses

-  Project Management (Parts of Scope)

-  Structural Analyses

-  Model Testing

-  CFD Analyses

 

To learn more about this project, click here.

Reference Work